Back to the list
Liebherr-Aerospace Lindenberg GmbH, Lindenberg im Allgäu
Information based on publicly available sources
Note on the Completeness of Project Information
The project information listed on this page usually does not include all requested details. Some information may be missing as it is not provided by the identified sources.
Project
| Location | Lindenberg im Allgäu |
|---|---|
| Country | Germany |
| State | Bavaria |
| Operator | Liebherr-Aerospace Lindenberg GmbH |
| Commissioning Year | 2014 |
| Commissioning Status | In Operation |
Product Details
| Heat Source | Industriell (Waste Heat) |
|---|---|
| Notes on Heat Source | Abwärme aus dem Produktionsprozess |
Sink and Source
| Sink Type | District Heating |
|---|---|
| Notes on Heat Sink | Wärmeversorgung Produktionshalle, Lager, Büroräume |
Technical Data
| Thermal Capacity [kW] | 500 |
|---|---|
| Compressor | No Information |
| Refrigerant |
References
| URL | https://www.energie-experten.org/projekte/liebh… |
|---|---|
| URL access date | Feb. 5, 2025 |
Data provided by the Portal for Large-Scale Heat Pumps © 2025 by Fraunhofer IEG is licensed under CC BY 4.0