Stadtwerke Bochum, Bochum
Information based on publicly available sources
Note on the Completeness of Project Information
The project information listed on this page usually does not include all requested details. Some information may be missing as it is not provided by the identified sources.
Project
Location | Bochum |
---|---|
Country | Germany |
State | North Rhine-Westphalia |
Operator | Stadtwerke Bochum |
Commissioning Year | 2024 |
Commissioning Status | Planned |
Product Details
Heat Source | Grubenwasser (Mine Water) |
---|---|
Notes on Heat Source | Grubenwasser des geschlossenen Bergwerks der Zeche Dannenbaum |
Sink and Source
Minimum Heat Source Temperature | 18 |
---|---|
Sink Type | District Heating |
Flow Temperature Heat Pump [°C] | 48 |
Technical Data
Thermal Capacity [kW] | 3,000 |
---|---|
Thermal Capacity Comment | 3 x 1.000 kW |
Compressor | No Information |
Refrigerant | Unbekannt |
References
URL | https://www.ieg.fraunhofer.de/de/presse/pressem… |
---|---|
URL access date | Feb. 5, 2025 |
URL | https://www.stadt-und-werk.de/k21-meldungen/96-… |
URL access date | Feb. 5, 2025 |
URL | https://www.facility-manager.de/aktuelles/caver… |