Project
Location Marburg
Country Germany
State Hesse
Operator Stadtwerke Marburg
Manufacturer Ochsner Energie Technik
Commissioning Year 2023
Commissioning Status In Operation
Product Details
Heat Source Kraftwerk (Waste Heat)
Sink and Source
Maximum Heat Source Temperature 30
Sink Type District Heating
Flow Temperature Heat Pump [°C] 90
Flow Temperature Heat Network [°C] 90
Return Temperature Heat Network [°C] 70
Technical Data
Thermal Capacity [kW] 420
Thermal Capacity Comment 200 kW / 200 kW (2-Stufig)
Operating Hours per Year 4,200
Heating Output [kWh/a] 1,800,000
Compressor Screw Compressor
Refrigerant R1233zd(E)
Product information
Filling Quantity [kg] 74
Length [mm] 3,630
Width [mm] 1,070
Height [mm] 1,440
Weight [kg] 1,800
Additional Systems Gaskessel
References